Syngas Storage for Advanced Plasma Power, Swindon, UK
- Date: April 2015
- Client and End User: Advanced Plasma Power
- Project Type: Syngas Storage
About this Project
Equipment | Four Stage Oil Free Reciprocating Compressor for Syngas Storage, and Vessels Package |
Cooling |
On-skid air blast |
Inlet pressure |
0 barg |
Discharge pressure |
50 barg |
Flow rate |
70 Nm3/h |
Installed motor power |
30 kW |
Scope |
Complete system with controls and acoustic enclosure |
Site |
Swindon, UK |
Delivery |
April 2015 |
Qty |
1 off |