Fuel Gas Boosters for Solar Gas Turbines, Perenco, Democratic Republic of Congo
- Date: January 2014
- Client: Perenco France
- End User: Perenco DRC
- Project Type: Fuel gas boosters to Solar gas turbines
About this Project
| Equipment | Single Stage Oil Flooded Twin Screw Compressors |
|
Cooling |
On-skid air blast |
|
Inlet pressure |
35 psig |
|
Discharge pressure |
245 psig |
|
Flow rate |
3 MMSCFD |
|
Installed motor power |
400 kW |
|
Scope |
Complete system with ATEX control panel |
|
Site |
Kinkasi, Democratic Republic of Congo |
|
Delivery |
January 2014 |
|
Qty |
2 off units |