Fuel Gas Boosters to Solar Gas Turbines for IGSA, Mexico City

  • Date: March 2012
  • Client: IGSA
  • Project Type: Fuel Gas Boosters to Solar Gas Turbines

About this Project

Equipment Single stage oil flooded single screw

Cooling

Stand-alone air blast radiator

Inlet pressure

7 barg

Discharge pressure

23 barg

Flow rate

5,600 scfm

Installed motor power

530 kW

Scope

Complete system with controls

Site

Mexico City

Delivery

March 2012

Qty

2 off

 

Fuel Gas Boosters to Solar Gas Turbines for IGSA P078

Lorem ipsum dolor sit consectetur adipiscing elit. Nullam lectus erat, consectetur eu sapien eget rhoncus consectetur sem.

Proin cursus, dolor a mollis consectetur, risus dolor fermentum massa, a commodo elit dui sit amet risus. Maecenas ornare nisl a tortor ultrices bibendum. Nulla fermentum, metus quis sodales tristique, augue mauris molestie augue non feugiat ligula neque nec felis.

Lectus erat, consectetur eu sapien eget rhoncus consectetur sem. Proin cursus, dolor a mollis consectetur, risus dolor fermentum massa, a commodo elit dui sit amet risus. Maecenas ornare nisl a tortor ultrices bibendum. Nulla fermentum, metus quis sodales tristique, augue mauris molestie augue, non feugiat ligula neque nec felis.

Related Projects

Service Title

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam

Service Title

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam

Service Title

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam

Contact Us

Lorem ipsum dolor sit amet consectetur elit.

+00 123 456 7893

divi-construction@gmail.com